1 00:00:05,990 --> 00:00:03,110 russian spacewalk 53 will be conducted 2 00:00:08,310 --> 00:00:06,000 by oleg artemyev ev1 and the red stripes 3 00:00:09,509 --> 00:00:08,320 and denise matviv ev2 in the blue 4 00:00:11,430 --> 00:00:09,519 stripes 5 00:00:13,350 --> 00:00:11,440 to start the spacewalk crew will egress 6 00:00:15,350 --> 00:00:13,360 the poisk airlock with a crew lock bag 7 00:00:16,710 --> 00:00:15,360 and tool carrier 8 00:00:18,710 --> 00:00:16,720 after turning on their cameras and 9 00:00:20,790 --> 00:00:18,720 lights both crew will start translating 10 00:00:23,750 --> 00:00:20,800 down the strella boom from poisk to the 11 00:00:27,589 --> 00:00:25,349 after translating nader of the solar 12 00:00:29,349 --> 00:00:27,599 rays ev1 and ev2 will take separate 13 00:00:34,069 --> 00:00:29,359 translation paths to the european 14 00:00:37,990 --> 00:00:36,150 ev1 and ev2 will work to remove 15 00:00:40,549 --> 00:00:38,000 insulation covers on the era end 16 00:00:42,709 --> 00:00:40,559 effectors afterwards they'll stow the 17 00:00:46,869 --> 00:00:42,719 crew lock bag and tool carrier on 18 00:00:52,710 --> 00:00:49,029 oleg will gather and jettison the covers 19 00:00:55,110 --> 00:00:52,720 in the station aft direction 20 00:00:57,510 --> 00:00:55,120 [Music] 21 00:00:59,029 --> 00:00:57,520 once complete with imagery ev1 releases 22 00:01:02,310 --> 00:00:59,039 the launch lock near the end effector 23 00:01:07,350 --> 00:01:02,320 joint as ev2 retrieves the tool carrier 24 00:01:11,910 --> 00:01:09,109 denise will then back off the grapple 25 00:01:19,270 --> 00:01:11,920 point from the end effector 26 00:01:23,030 --> 00:01:21,030 ev2 will monitor motion of the end 27 00:01:25,270 --> 00:01:23,040 effector joint once the end effector has 28 00:01:27,030 --> 00:01:25,280 completed its first motion ev1 will 29 00:01:28,469 --> 00:01:27,040 remove a launch lock that will then lead 30 00:01:34,550 --> 00:01:28,479 to an additional motion of the end 31 00:01:39,190 --> 00:01:36,230 crew will work together to continue 32 00:01:41,109 --> 00:01:39,200 releasing various era launch locks at 33 00:01:43,030 --> 00:01:41,119 which point the era shoulder limb will 34 00:01:45,570 --> 00:01:43,040 be rotated to allow handrails to be 35 00:02:02,360 --> 00:01:45,580 installed 36 00:02:02,370 --> 00:02:07,830 [Music] 37 00:02:13,190 --> 00:02:10,469 as crew verifies safe motion era will be 38 00:02:15,589 --> 00:02:13,200 maneuvered to grapple onto nowuka base 39 00:02:17,110 --> 00:02:15,599 point one 40 00:02:18,869 --> 00:02:17,120 crew translates to the remaining end 41 00:02:25,090 --> 00:02:18,879 effector to repeat the process of 42 00:02:25,100 --> 00:02:29,589 [Music] 43 00:02:33,350 --> 00:02:31,270 the end effector is moved away from 44 00:02:37,520 --> 00:02:33,360 structure slightly to allow access to 45 00:02:42,390 --> 00:02:40,869 [Music] 46 00:02:44,150 --> 00:02:42,400 oleg and denise will translate to 47 00:02:47,240 --> 00:02:44,160 provide safe motion calls for the next 48 00:02:49,990 --> 00:02:47,250 era maneuvers 49 00:02:51,350 --> 00:02:50,000 [Music] 50 00:02:55,010 --> 00:02:51,360 eero will grapple its second end 51 00:03:00,949 --> 00:02:59,110 [Music] 52 00:03:03,350 --> 00:03:00,959 the team will then ungrapple from base 53 00:03:05,780 --> 00:03:03,360 point one and maneuver over to base 54 00:03:11,589 --> 00:03:05,790 point 3. 55 00:03:15,270 --> 00:03:12,869 crew will gather their tools and 56 00:03:18,290 --> 00:03:15,280 translate zenith up the nowuka module 57 00:03:23,589 --> 00:03:18,300 and strela boom to the poisk airlock 58 00:03:25,589 --> 00:03:23,599 [Music] 59 00:03:29,480 --> 00:03:25,599 there crew will stow their bags and